Stormwater Management
Welcome to the Town of Lewisville Stormwater Division of the Public Works Department. The Stormwater Department provides comprehensive stormwater pollution management for Town’s residents and businesses as part of the Public Works Department. The program's two major elements are water quality protection through the Environmental Protection Agency's (EPA) Phase II Permit Water Quality Act and Town's Stormwater Management and Watershed Protection Ordinance (PDF, 317.85 KB). The Town is required to operate a stormwater program under a permit issued by EPA's National Pollutant Discharge Elimination System (NPDES) Municipal Separate Storm Sewer System (MS4) program mandated under the federal Clean Water Act which is overseen by the NC Department of Environmental Quality (DEQ).
Duties
The NPDES Permit itemizes required actions in six management areas that reduce stormwater pollution and assures clean water is maintained in our nation's water bodies. These areas include:
- Public Education & Outreach
- Public Involvement & Participation
- Illicit Discharge Detection & Elimination
- Construction Site Runoff Controls
- Post-Construction Site Runoff Controls
- Pollution Prevention & Good Housekeeping
Contact Information
STORMWATER HOTLINE: 336-945-1020
Email: publicworks@lewisvillenc.net
Phone: 336-945-1020
Report a Problem(opens in a new tab)
PUBLIC EDUCATION & OUTREACH
The Town of Lewisville is a member of Stormwater SMART (www.stormwatersmart.org(opens in a new tab)).

Proper Pet Waste Disposal(opens in a new tab) (PDF, 3.31 MB)
Applications & Fees
Stormwater Application(opens in a new tab) (PDF, 168.64 KB)
Stormwater Fees(opens in a new tab) (PDF, 34 KB)
Lewisville Driveway Application Cover Sheet(opens in a new tab) (PDF, 496.33 KB)
Lewisville Driveway Application Worksheet(opens in a new tab) (PDF, 388.14 KB)
Important Resources
Comprehensive Stormwater Management Plan(opens in a new tab) (PDF, 1.09 MB)
Stormwater Drainage Management Policy (PDF, 14.35 KB)
Stormwater Management and Watershed Protection Ordinance (PDF, 317.85 KB)
Phase II Stormwater Administrative Manual Revision 2019(opens in a new tab) (PDF, 230.45 KB)
Annual SCM Inspection Report (PDF, 1.04 MB) - Due annually by June 30